Current Position:HOME>>Products>>25L£­100L Middle equipment for steel drum
 

Introduction for the equipment£ş

ĦĦĦĦThere are three phases for steel drum process: preceding stage, middle stage and afterward stage. The equipment, employed in the preceding & afterward stages, is chosen from standard articles, which you can buy (or purchased by our factory)from the market, e.g. plate shear, welding machine, cleaner and air painter etc. the middle mould equipments are special one only supplied by our company, which major contracted process on open part of drum and bottom flanging and roll upon the drum body with corrugated reinforcing steel. In addition, the company also provides blanking die for lid & bottom , curling equipment & printer for drum body and ribbing equipment for 200 litres of drum.

   
Drum Model manufactured
Corrugated machine Model YGT100.BW
Contracted machine Model YGT100.SK
Bottom sealer & blind roller Model YGT100.FD(J)
Flanging machine Model YGT100.BB
Double-ended bottom sealer Model YGT100.FD(S)
Double-ended flanging machine Model YGT100.BB
Screen printer Model SY450
Curling machine Model SG450ĦÁ800
Hoop-roll machine Model ZG450

Address: #2, Lane 90 th , Wu Qiao Road, Wenzhou, Zhejiang, P. R. China; Post code: 325000; TEL:0044-778-689-8805 (U.K.); 0044-772-868-8850 (U.K.); 0086-577-8862-0512 (P. R. China) FAX: 0086-577-88628812

COPYRIGHT Wenzhou Fibre & Steel Drum Machineries Co., Ltd.RESERVED. ĦĦE-mail: zhengyi125@hotmail.com (Jenny Zheng); dongli75@googlemail.com (Lee Dong)ĦĦ